State Engineer to Study Groundwater

Summary#

Since July 1, 2026, Wyoming’s state engineer must study groundwater in certain counties at least once every ten years, subject to available funding. SF 50, State engineer-surface and ground water study, created a new section of the Wyoming Statutes.

  • The required counties have a groundwater control area and at least one corrective control ordered by the state engineer.
  • Studies must assess those controls, aquifer recharge compared with water use, and the effects of future development.
  • The state engineer may also study counties without a control area. Study results must be made public and reported to a legislative committee.

What changes#

Wyoming Statutes, section 41-3-939

WhatTodayUnder this bill
Required counties and frequencyNewSubject to available funding, the state engineer must study each county with a board-designated groundwater control area and at least one ordered corrective control, at least once every ten years.
Study subjectsNewStudies must assess corrective controls, aquifer recharge compared with water use, and the effect of future development.
Counties without a control areaNewThe state engineer may study these counties if the state engineer considers it necessary.
Public results and reportingNewResults must be public and reported to the Joint Agriculture, State and Public Lands and Water Resources Interim Committee within 60 days after completion.
First study deadlineNewThe first required study must be completed by June 30, 2030.

Who is affected#

  • State engineer’s office: It must carry out the required studies, subject to available funding. Studies may include mapping, modeling, and drilling monitoring wells.
  • Legislative committee: It must receive each study’s results within the required reporting period.
  • The public: Study results must be made public. The law does not change water rights, permits, or pumping limits.

Cost#

The law appropriates $500,000 from the general fund for the study work.

  • The money is restricted to that purpose, is available through June 30, 2031, and any unspent, unobligated balance reverts after that date.
  • The legislature says this appropriation is not intended to be included in the state engineer’s standard budget for the next fiscal biennium. The law gives no cost estimate for later studies.

What is unclear#

  • The recurring study requirement depends on available funding, but the law does not identify funding for studies after the appropriation period.

Case for#

  • Studying counties where corrective controls have been ordered can show how those controls relate to aquifer recharge, water use, and future development. Public results can give residents and lawmakers information about those conditions.
  • Allowing the state engineer to study counties without control areas gives the office discretion to investigate places it considers important, rather than limiting studies to counties that meet the required criteria.

Case against#

  • The law sets a recurring study duty but makes it subject to available funding. Without continuing funding, later studies may not happen on the intended schedule, leaving gaps in information.
  • The state engineer can choose to study counties without control areas without criteria in the law for making that choice. That leaves the public with less certainty about which additional areas will receive study attention.

Votes

4 recorded votes on this bill, newest first.

  1. Division No. 1641748

    Passed30 members voted

    3rd Reading:Passed 29-1-1-0-0

    FOR · 29AGAINST · 1

    Each dot is one member. Hover or tap one to see who.

    29For

    • Republican27
    • Democratic2

    1Against

    • Republican1

    1 member was paired and sat out the vote.

  2. Division No. 1639637

    Passed31 members voted

    Recalled from Committee Pursuant to Senate Rule 5-5: 29-2-0-0-0

    FOR · 29AGAINST · 2

    Each dot is one member. Hover or tap one to see who.

    29For

    • Republican27
    • Democratic2

    2Against

    • Republican2
  3. Division No. 1635208

    Passed5 members voted

    S05 - Agriculture:Recommend Amend and Do Pass 4-1-0-0-0

    FOR · 4AGAINST · 1

    Each dot is one member. Hover or tap one to see who.

    4For

    • Republican4

    1Against

    • Republican1
  4. Division No. 1628130

    Passed30 members voted

    Introduced and Referred to S05 - Agriculture 25-5-1-0-0

    FOR · 25AGAINST · 5

    Each dot is one member. Hover or tap one to see who.

    25For

    • Republican23
    • Democratic2

    5Against

    • Republican5

    1 member was paired and sat out the vote.