Division No. 1641748
Passed30 members voted
3rd Reading:Passed 29-1-1-0-0
Each dot is one member. Hover or tap one to see who.
29For
- Republican27
- Democratic2
1Against
- Republican1
1 member was paired and sat out the vote.
Since July 1, 2026, Wyoming’s state engineer must study groundwater in certain counties at least once every ten years, subject to available funding. SF 50, State engineer-surface and ground water study, created a new section of the Wyoming Statutes.
Wyoming Statutes, section 41-3-939
| What | Today | Under this bill |
|---|---|---|
| Required counties and frequency | New | Subject to available funding, the state engineer must study each county with a board-designated groundwater control area and at least one ordered corrective control, at least once every ten years. |
| Study subjects | New | Studies must assess corrective controls, aquifer recharge compared with water use, and the effect of future development. |
| Counties without a control area | New | The state engineer may study these counties if the state engineer considers it necessary. |
| Public results and reporting | New | Results must be public and reported to the Joint Agriculture, State and Public Lands and Water Resources Interim Committee within 60 days after completion. |
| First study deadline | New | The first required study must be completed by June 30, 2030. |
The law appropriates $500,000 from the general fund for the study work.
4 recorded votes on this bill, newest first.
Passed30 members voted
3rd Reading:Passed 29-1-1-0-0
Each dot is one member. Hover or tap one to see who.
29For
1Against
1 member was paired and sat out the vote.
Passed31 members voted
Recalled from Committee Pursuant to Senate Rule 5-5: 29-2-0-0-0
Each dot is one member. Hover or tap one to see who.
29For
2Against
Passed5 members voted
S05 - Agriculture:Recommend Amend and Do Pass 4-1-0-0-0
Each dot is one member. Hover or tap one to see who.
4For
1Against
Passed30 members voted
Introduced and Referred to S05 - Agriculture 25-5-1-0-0
Each dot is one member. Hover or tap one to see who.
25For
5Against
1 member was paired and sat out the vote.
Bills on related subjects, starting with Wyoming.
The failed bill would have given the state engineer $500,000 to study large-scale industrial, data center and hydrogen water use, with findings due November 1, 2026.
Status
COW:H Did not consider for COW
The bill directs the Department of Environmental Quality to study public wastewater and stormwater systems, requires local governments to share data, and appropriates $8 million through June 2030.
Status
Assigned Chapter Number 105
The bill would require the legislature to authorize eminent domain for certain state-funded water projects after money is appropriated and a commission recommends it.
Status
COW:Failed 9-17-5-0-0
The water-planning bill gives the Water Development Commission one-time funds for named studies, including $1.575 million for Nowood River; its report moves to 2026, and funds revert in 2027.
Status
Assigned Chapter Number 35