The Civics Project

Requiring the installation of pedestrian lighting on step streets

Summary#

Introduction 228-2026, sponsored by Council Member Kamillah Hanks, would amend New York City’s Administrative Code. It would require the Transportation Commissioner to install pedestrian lighting on step streets; the stated goal is to ensure they are sufficiently lit for pedestrians. The bill was introduced and referred to committee on January 29, 2026, and is waiting in committee. It is not law.

  • Each calendar year, starting with the first calendar year that begins after the law takes effect, the Commissioner must install lighting on at least 25 step streets. Each must meet the bill’s lighting standard along its entire length.
  • “Sufficient lighting” means at least 1 footcandle (11 lux) at the walking surface. A “step street” is a public, open-air pedestrian staircase connecting two streets at different elevations.
  • The Commissioner may stop installing fixtures once every step street has sufficient lighting.
  • The bill would take effect immediately if it becomes law.

What it means for you#

  • People using step streets: The bill would require lighting on at least 25 step streets each year, with the stated illumination level along each selected street’s full length.
  • Transportation Department: Its Commissioner would have to carry out the annual installations. The bill does not say how streets would be selected.
  • Other residents and businesses: The bill does not directly change their rights, fees, or duties.

Money#

No cost information is in the available material.

  • The bill requires the Commissioner to install lighting, but gives no spending estimate or staffing details.

What is unclear#

  • The supplied materials do not include the current Administrative Code text, so I could not verify what lighting duties already exist.
  • The materials do not state how many step streets there are or how many already meet the standard.
  • The bill does not set a deadline for lighting every step street, or explain how the Commissioner would choose which streets to light first.
  • The materials do not explain how installation and maintenance would be funded.

Case for#

  • The bill’s stated requirement sets a measurable minimum for lighting step streets and requires the standard to be met along each selected street’s entire length.
  • A possible argument for the bill is that a yearly minimum would make progress toward lighting all step streets, while allowing installations to stop once all meet the standard.

Case against#

  • The bill sets no deadline for lighting all step streets. If there are many streets that do not meet the standard, the minimum of 25 per year could mean the work takes multiple years.
  • The text does not specify how streets would be prioritized or how the required installations would be paid for.