Study and report on the expansion of ferry service along the Harlem River

Summary#

Introduction 0465-2026, sponsored by Council Member Althea V. Stevens, would create a city-law duty for the Department of Transportation (DOT) commissioner to study whether ferry service could be expanded along the Harlem River, especially to the West Bronx. Its stated goal is to assess the feasibility and costs of that expansion; it would not itself add ferry service. The latest history supplied shows the bill was heard and laid over in three committees on April 29, 2026, with no Council vote recorded, so it is not law.

  • The commissioner must coordinate with the contracted entity operating NYC Ferry and study possible terminal sites, local benefits, logistical challenges, possible solutions, and projected siting and implementation costs.
  • The study must examine boat size and structure, river depth and navigability, existing waterfront facilities, conflicts with maritime uses, and any needed coordination with state or federal agencies.
  • Within one year after the law takes effect, the commissioner must send the report to the mayor and Council speaker and post it on DOT’s website.

What it means for you#

  • West Bronx residents and other communities along the Harlem River: The study must consider possible benefits such as better transit access, shorter travel times, and connections to jobs and other destinations. No new ferry route or terminal is guaranteed.
  • DOT: The commissioner would have to conduct the study and publish the report.
  • NYC Ferry’s contracted operator: The commissioner must coordinate with the contracted entity. The bill does not specify what cooperation that requires.
  • Ferry passengers and the public: The bill would not directly change routes, fares, or ferry service.

Money#

No cost information is available for conducting the study.

  • The commissioner must estimate projected costs of potential terminal siting and any proposed solutions to challenges. The bill does not provide those estimates or require implementation.

What is unclear#

  • The bill does not set study methods, standards for evaluating sites, or a process for public input.
  • It does not say what happens after the report or require the city to act on its findings.
  • It does not specify study staffing, funding, or what coordination with the contracted entity involves.

Case for#

  • The bill’s required study would assess possible transit, travel-time, and destination-access benefits before the city decides whether to expand ferry access.
  • The text requires the study to examine practical barriers and estimate implementation costs, which could help inform a later decision.

Case against#

  • The bill requires a study but does not require the city to expand service, even if the report identifies possible benefits.
  • The bill does not provide a budget or staffing plan for the study, so its cost to the city is unknown.