Summary#

Introduction 526, sponsored by Council Member Carmen N. De La Rosa, would amend the New York City Building Code. Its stated goal is to require space for organic waste in multiple dwellings; the text also changes minimum storage-space rules for Group R-2 occupancies. It is waiting in committee and is not law.

  • Group R-2 occupancies would have to provide common space for refuse, recyclables and organic waste, with the location shown on construction documents and access for building personnel.
  • The general minimum would change from 1.5 to 2 square feet per dwelling unit, or from 350 to 450 square feet, whichever amount is less. The text says this minimum is for refuse and recyclables, leaving unclear how it applies to organic waste.
  • Where a compactor is required, the minimum would remain 1 square foot per dwelling unit or 350 square feet, whichever is less, in addition to equipment and circulation space. The space would include organic waste.
  • A building with an approved chute and mechanical system that separates and transports refuse, recyclables and organic waste without cross-contamination would not need the storage space.
  • Interior storage rooms would need a two-hour fire rating. Exterior storage space would need at least 4 additional square feet and could not be in the public right-of-way.

What it means for you#

  • People planning or building Group R-2 dwellings: The text would require the specified storage space and construction-plan details. It does not expressly limit the requirement to newly constructed buildings, despite the title and Council summary.
  • Residents: The text does not create a new resident duty, benefit or waste-collection service.
  • Building officials: The text refers to a commissioner approving certain chute and mechanical systems, but does not name the agency or set out an approval process.

Money#

No cost information is in the available material.

  • The bill would require space in buildings, which could affect building design or construction costs; the amount is not stated.
  • It does not set a fee, fine, appropriation or funding source.

What is unclear#

  • The bill says it takes effect January 1, 2023, a date before its introduction on February 12, 2026. It does not explain this date or how it would apply.
  • The title and summary describe newly constructed dwellings, but the operative text says “Group R-2 occupancies” without that limit.
  • The general minimum-size sentence names refuse and recyclables, but not organic waste, even though earlier wording includes organic waste in the required storage space.
  • The text does not set out who checks compliance, how the commissioner reviews systems, or how the requirement interacts with existing buildings.

Case for#

  • The bill appears intended to ensure buildings have space to store organic waste alongside refuse and recyclables.
  • Requiring the space and its location to appear on construction documents could make it part of building planning.
  • The exception allows buildings with an approved system for separating and transporting the materials to avoid the storage-space requirement.

Case against#

  • One concern is that the unclear effective date and scope could make it hard to know which buildings must comply.
  • The bill does not clearly state how much space must be provided for organic waste under the general minimum-size rule.
  • The space requirement could affect building design or costs, but the bill provides no estimate.