Establishing a pilot program to study increasing the minimum percentage of reclaimed asphalt pavement in asphaltic concrete

Summary#

Introduction 890-2026, sponsored by Phil Wong, would create a new local law; it does not name a City code or Charter provision to amend. It would require the Department of Design and Construction (DDC) and the Department of Transportation (DOT) to run a pilot study. The stated goal is to study increasing the minimum share of reclaimed asphalt pavement (reused asphalt) in city paving mix; the bill does not itself raise a citywide minimum.

  • Within 90 days after the law takes effect, DDC and DOT must establish a pilot with at least five street-paving projects. The commissioners choose streets used by light-duty vehicles, heavy-duty vehicles, or both.
  • Each pilot project must use asphaltic concrete with at least 30% reclaimed asphalt pavement, and projects must use varying percentages chosen by the two commissioners.
  • The commissioners must report on the pilot, including durability, costs, reclaimed-asphalt availability and recommendations. But the bill sets the report deadline as May 1, 2024, before its 2026 introduction.
  • The bill is waiting in committee after referral on April 30, 2026. It is not law.

What it means for you#

  • City agencies: DDC and DOT would have to run the pilot together and submit and publish the report. The bill does not set criteria for choosing the streets or percentages beyond the stated minimum and requirement for variation.
  • Residents and drivers: The pilot would affect paving on at least five city streets. The bill does not impose new duties on drivers or residents.
  • Businesses: The bill does not directly impose requirements on asphalt suppliers or paving contractors, though the pilot specifies the mix used on city projects.
  • The materials do not establish the current citywide minimum for reclaimed asphalt pavement.

Money#

The bill requires the report to include pilot costs and projected costs of expanding and maintaining such a program, but the available material gives no cost estimate.

  • It does not specify an appropriation, staffing level, or funding source.

What is unclear#

  • The report deadline, May 1, 2024, has already passed; the bill does not say what deadline should apply instead.
  • The bill does not set a process for selecting the five or more streets, or criteria for the varying percentages.
  • The current citywide minimum, and how the pilot would relate to it, are not established in the available material.
  • The bill does not give a start date beyond saying it takes effect immediately if enacted.

Case for#

  • The pilot would let the city compare paving mixes with different reclaimed-asphalt shares across streets used by light- and heavy-duty vehicles.
  • The required report would examine durability, costs, supply limits, and possible next steps before the city decides whether to increase its minimum.

Case against#

  • One concern is that the bill requires a 30% minimum in every pilot project without explaining why that level is suitable for the selected streets.
  • The report deadline is already past, and the bill gives no replacement date.
  • The commissioners have wide discretion over street selection and mix percentages, with no stated selection criteria.