Calling on the MTA to initiate a capital project to construct a deck over portions of the Long Island Rail Road Port Washington Branch open cut between Flushing and Murray Hill, Queens, to create usable space and improve neighborhood connectivity

Summary#

Resolution 0656-2026, sponsored by Council Member Sandra Ung, calls on the Metropolitan Transportation Authority (MTA) to start a capital project to deck over parts of the Long Island Rail Road’s Port Washington Branch open cut between Flushing and Murray Hill, Queens. It would not change city law or require the MTA to act; the resolution is in committee after being referred on September 24, 2026.

  • The requested project is meant to create usable space and improve connections between neighborhoods.
  • The resolution’s preamble says a prior city study found a linear park could be possible, but identifies engineering issues that would need attention.

What it means for you#

  • Residents and businesses nearby: The resolution itself creates no new park, parking, or other public space, and does not require construction.
  • MTA and LIRR: The Council asks the MTA to start a capital project. The resolution does not bind the MTA or set a construction schedule.

Money#

No publicly available information on the project’s cost.

What is unclear#

  • Which portions would be decked, what the space would be used for, and how the project would be funded are not specified.
  • The preamble says an updated analysis and consultation with City agencies and the community are needed. The resolution’s final request does not set out a process, deadline, or requirement for those steps.

Case for#

  • The resolution’s sponsors cite the open cut as a barrier between neighborhoods and say decking could create public space and improve connections.
  • The sponsors also point to possible benefits for local businesses and parking, alongside potential uses such as a park, paths, and recreation space.

Case against#

  • The resolution notes that a prior city study identified issues to address, including ventilation, security, emergency access, light and air, and effects on nearby properties. The project’s feasibility and impacts are not established in this resolution.
  • Because the resolution is nonbinding and gives no cost or schedule, it does not ensure that the MTA will proceed or that the proposed benefits will result.