News ReleaseTransportation and TransitOctober 13, 2026

Flood repairs keep part of Allenby Road closed through spring 2027

The stretch from beyond Boys Road to Miller Road remains closed while crews stabilize the slope and repair the road; local access will remain open.

Summary

The closure: Allenby Road remains closed from just past Boys Road to Miller Road in Duncan until spring 2027. Crews need more time to stabilize the slope and make road improvements after damage from the 2021 flooding.

  • Local access will remain available.
  • Drivers should use Highway 1 as the alternative route and follow posted signs and traffic-control personnel.
  • The work is intended to restore the road to two-lane traffic.

Related links

Source: BC Gov News

Official release