The Chair (Hon. Laurie Scott)

Good afternoon, everyone. The Standing Committee on Heritage, Infrastructure and Cultural Policy will now come to order. We are meeting to consider the 2025-26 estimates of the Ministry of Transportation for a total of two hours. We are joined today by staff from Hansard, broadcast and recording, and legislative research. From the ministry, we are joined by the Honourable Prabmeet Sarkaria, Minister of Transportation, parliamentary assistant MPP Ric Bresee, acting deputy minister Felix Fung, and ministry officials and staff. As a reminder, the ministry is required to monitor the proceedings for any questions or issues that the ministry undertakes to address. I trust that the deputy minister has arranged to have the hearings closely monitored with respect to questions raised so that the ministry can respond accordingly. Are there any questions from the members before we start? Seeing none—

Official source

3:31 p.m.Official transcript

The Chair (Hon. Laurie Scott)

Yes. I am now required to call vote 2701, which sets the review process in motion. We will begin with a statement from the minister for up to 20 minutes. Minister, welcome, and the floor is yours.

Official source

3:31 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

Thank you very much, Chair. Good afternoon to everyone. I appreciate the opportunity to be before the committee here to discuss the important work the Ministry of Transportation is doing to keep people and goods moving across our province in the face of economic uncertainty. Gridlock costs upward of $56 billion each year. That’s a cost that we cannot afford. Now more than ever, we must protect Ontario by investing in highways and public transit that will drive economic growth and generate good jobs for Ontario workers. Our government is spending $30 billion to build, repair and expand highways, roads and bridges across the province. We’re spending $70 billion on the largest transit expansion in North America, including the largest subway expansion in Canadian history. These investments come with a hefty price tag, but the cost of doing nothing is far greater. Last year, our government tabled the Reducing Gridlock, Saving You Time Act, which has allowed us to accelerate construction of priority projects such as Highway 413, the Bradford Bypass and the QEW Garden City Skyway twin bridge. Highway 413 will connect the regions of Peel, York and Halton, spanning 52 kilometres in length, running from Highway 400 in the east to Highway 401/407 interchange in the west. It would also include extensions to Highway 410 and Highway 427. In August, we awarded the first two early works contracts for Highway 413. Crews are resurfacing a section of Highway 10 where a new bridge will carry traffic over Highway 413. And we’re making upgrades to the Highway 401/407 interchange, which will serve as a western terminus of Highway 413. Building Highway 413 is expected to support more than 6,000 jobs per year. It will contribute $1 billion to Ontario’s GDP. Our ministry is also moving forward to accelerate construction of the Bradford Bypass, a 16-kilometre, four-lane freeway that will connect Highway 404 in the east to Highway 400 in the west, shortening travel times for the thousands of drivers in York region and Simcoe county. Detailed design work for the west section of the Bradford Bypass is under way. Crews have completed tree clearing along the proposed western route. And earlier this year, we issued a request for proposals for the detailed design of the central and east sections of the Bradford Bypass. During construction, the Bradford Bypass is expected to support up to 1,300 jobs annually and contribute up to $190 million to Ontario’s GDP. The QEW Garden City Skyway is a key link in Ontario’s highway network, connecting Niagara region’s three crossings with the United States and supporting the movement of more than $1.1 trillion worth of goods through the greater Golden Horseshoe every year. Our government is building a 2.2-kilometre Garden City Skyway twin bridge that will carry Toronto-bound traffic over the Welland Canal. Earlier this year, we awarded a contract for the detailed design of the new bridge. Once the new bridge is complete, the existing bridge will be rehabilitated and carry Niagara-bound traffic. The Ontario highways program features 629 highway expansion and rehabilitation projects that are currently under way or planned across the province. In the current fiscal year, our government is investing $4.3 billion in support of the program. This includes $2.1 billion to expand and repair highways in southern Ontario and $583 million for highway projects in northern Ontario. This year, we marked significant milestones on several projects. We added nine kilometres of new lanes to Highway 400 from Major Mackenzie Drive to King Road. We added 11 kilometres of HOV lanes to Highway 404 from Highway 407 to Stouffville Road. We’ve set the stage to widen Highway 401 in Durham region by awarding contracts to replace the Park Road and Cubert Street overpasses. We are laying the groundwork to widen Highway 400 in Simcoe county by replacing the Dunlop Street and Bayfield Street bridges in Barrie. We’re replacing the Choate Road overpass and the Ganaraska River bridge to support the future widening of Highway 401 near Port Hope. We’re building a new roundabout at Highway 15 and County Road 42 in the township of Rideau Lakes. And we have improved the connection between Guelph and Highway 401 by adding a new interchange and underpass to the Hanlon Expressway at Wellington County Road 34. We recently also awarded a detailed design contract to replace the Little Current Swing Bridge—the only road access to Manitoulin Island in northern Ontario. We continue to work to widen the Trans-Canada Highway from Thunder Bay and from Kenora to the Manitoba border. We’ve started with the preliminary design to widen the Trans-Canada Highway from Thunder Bay to Kakabeka Falls. We’re widening Highway 69 from Parry Sound to Sudbury, improving traffic flow along a vital route for Ontario’s energy sector. We’ve launched a pilot—a historic pilot, the first of its kind in North America—to build a 2+1 highway near North Bay to enhance road safety. If this pilot is successful, Ontario would become the first jurisdiction in North America with a 2+1 highway. Our government is helping municipalities maintain their road infrastructure. We also, this year, awarded $45 million through the Connecting Links Program to support repairs for municipal roads and bridges connecting to the provincial highway network. And 27 municipalities received funding for 29 repair projects that will connect Ontarians to jobs, support the movement of goods and stimulate economic growth for years to come. We’re tackling congestion in Toronto by providing the city with up to $73 million to accelerate construction on the Gardiner Expressway. Thanks to provincial support, construction on the Gardiner is now months ahead of schedule—and completed. We’re saving Ontario’s economy $273 million by getting people and goods out of gridlock 18 months sooner than originally planned. We’re supporting Ontario’s electric vehicle industry and encouraging more drivers to go electric through the EV ChargeON program. We’re investing over $180 million to increase the number of public EV charging stations across the province to reduce range anxiety, fill gaps in under-served areas, and build a more affordable and connected charging network for everyone in Ontario. Another key priority of the province has been commercial vehicle safety. Earlier this year, transportation enforcement officers worked alongside policing partners and the Canada Border Services Agency to crack down on illegal activity at critical US border crossings as part of Operation Deterrence. Over 100 transportation enforcement officers conducted more than 60,000 vehicle inspections and intercepted 18 stolen vehicles. As part of Operation Deterrence, the ministry acquired mobile X-ray scanners, which are now being used at commercial vehicle inspection stations to ensure truck loads are secure and dangerous goods are transported safely. We are also moving forward with a historic expansion of public transit. We recently completed a successful revenue service demonstration of the Finch West LRT in Toronto and handed full operational control of the line over to the TTC, the Toronto Transit Commission. The Finch West LRT will put 230,000 people within walking distance of fast, reliable transit, accommodating 51,000 passengers each day and 12 million boardings annually by the year 2031. On November 16, we will open the Mount Dennis GO and UP Express station, which will connect riders to GO Transit’s Kitchener line, the UP Express and TTC bus services. In Toronto, we have shovels in the ground across the entirety of the Ontario Line subway. This will give the city 15 new subway stations, running from Exhibition Place through the downtown core to Eglinton and Don Mills. This summer, we broke ground on the Ontario Line’s second tunnel launch shaft. The Ontario Line will support 4,700 good-paying jobs annually during construction. Once complete, the new subway line will put nearly 230,000 Ontarians within walking distance of transit, offering connections to more than 40 other transit routes and reducing crowding on the busiest stretch of the TTC’s Line 1 subway by up to 15%. The Yonge North subway extension will extend the Line 1 subway into Vaughan, Markham and Richmond Hill for the first time. This summer, we awarded a contract to design and build the extension’s twin tunnels, bringing us one step closer to putting 26,000 Ontarians within walking distance of rapid transit. The Yonge North Subway Extension will cut travel times from Markham to downtown Toronto by as much as 22 minutes. Construction will support 4,300 jobs annually and generate more than $3.6 billion in economic benefits for Ontario’s economy. We recently broke ground on the Scarborough Centre Station, the first of three stations for the Scarborough subway extension. The extension will add almost eight kilometres to the TTC’s Line 2 subway, running from Kennedy Station to Sheppard Avenue and McCowan Road. Accommodating up to 105,000 daily trips, construction of the subway extension will keep 3,000 workers on the job each year and put 38,000 people within walking distance of transit. In March, we awarded a construction contract for Toronto’s East Harbour Transit Hub, which will improve access to transit for thousands of residents and support more than 50,000 local jobs. The hub will serve approximately 100,000 daily riders, with connections to the Ontario Line, the subway, and the Lakeshore East and Stouffville GO lines. The Eglinton Crosstown West extension will add seven stations to Line 5, Eglinton LRT, connecting riders from Scarborough to Mississauga. This year, we broke ground on the final tunnel segment of the nine-kilometre extension. Crews are excavating 500-metre twin tunnels under Eglinton Avenue West from Jane Street to the future Mount Dennis station. Building the extension will support an integrated and efficient transportation network and create more than 4,500 good-paying jobs. Work continues on the Hazel McCallion Line. We’re exploring options to tunnel the Brampton extension, which will connect the Brampton Innovation District GO station and the downtown core. We marked a significant milestone in Hamilton earlier this year when we issued a request for proposals for the first package of work for the Hamilton LRT. Once complete, the Hamilton LRT will have 17 stops across the city, connecting 50,000 daily commuters to an expanded Hamilton Street Railway and GO network. We’re also really excited about the province’s GO expansion program, which will bring two-way, all-day service to GO Transit’s busiest rail routes. We continue to upgrade stations across the GO network and add new tracks to accommodate future service increases on Lakeshore East, the Lakeshore West line, the Stouffville line and the Barrie line. Earlier this year, we completed upgrades to the West Harbour GO station. That will save more than 250,000 commuters in Niagara Falls and St. Catharines roughly 15 minutes on a round trip. Our three GO extension projects: Expansions will bring new and improved service to commuters in Durham region, Kitchener-Waterloo, Hamilton and Niagara. For the Kitchener GO extension, we’ve built a second platform at Guelph Central GO station, a new storage track for maintenance vehicles, and a new passing track between Guelph and Kitchener GO stations. The Bowmanville extension will extend the Lakeshore East line nearly 20 kilometres. For the Niagara extension, we will continue to increase service on the Lakeshore West line. We recently completed construction of the new Confederation GO station in Hamilton, which will offer 13 train trips each weekday and 15 trips on weekends, in addition to serving as a hub for regional GO bus service. These investments are working, and riders are responding. GO ridership is stronger than ever.

Official source

3:44 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

In September, we broke a record, reaching 7.4 million trips on GO and UP Express combined, our biggest ridership month ever. I’m proud to say that weekend ridership has also increased 157% compared to pre-pandemic levels. That’s real confidence in the system and proof that when transit is frequent, reliable and affordable, people choose GO. Our government is supporting local industries as we maintain our GO Transit fleet. Earlier this year, we invested nearly $500 million to refurbish GO Transit rail cars at the Alstom plant in Thunder Bay, and more than $350 million to refurbish rail cars at Ontario Northland’s facility in North Bay. Our government is restoring passenger rail service in northern Ontario. Once the Northlander is back in service, it will connect Toronto to Timmins with 16 stops, including a rail extension to Cochrane. And this summer, we broke ground on the Timmins-Porcupine Station, the Northlander’s northern terminal station. We also completed the North Bay rail bypass, a 982-metre track that will shorten travel times by over 15 minutes. This year, we awarded more than $380 million through Ontario’s gas tax program to help 106 municipalities expand service hours and routes, purchase new vehicles and improve accessibility to increase transit ridership. Last fall, our ministry launched the Ontario Transit Investment Fund to address transit gaps across Ontario, particularly in rural communities. This year, we awarded nearly $15 million through programs in Grey county, Middlesex county, Lambton Shores and North Grenville. Each municipality is receiving up to five years of funding to support the expansion and integration of transit services in our communities. Our government is investing $215 million to grow Ontario’s shipbuilding and marine sector. This year, we established a $15-million Ontario Shipbuilding Grant Program to expand the province’s shipbuilding sector and support Canada’s National Shipbuilding Strategy. The first of its kind program will provide funding to bolster Ontario’s shipbuilding capacity, competitiveness and business growth, while strengthening the industry’s workforce. Our government recently tabled legislation that will protect Ontario’s economy, allowing us to build faster and to get people moving. My ministry put forward initiatives that will make life better for people and communities across all Ontario by: —prohibiting municipalities from operating automated speed enforcement cameras and helping them transition to traffic-calming measures to help keep roads safe; —accelerating the delivery of public transit projects by expanding measures in the Building Transit Faster Act;

Official source

3:50 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

—prohibiting all municipalities from reducing the number of vehicle lanes to install new bike lanes; —setting the stage to streamline the construction of municipal roads so we can deliver much-needed infrastructure without unnecessary delays; and —requiring all drivers from non-reciprocal jurisdictions to complete a G2 and G road test before becoming fully licensed to enhance road safety. Few ministries have as wide-ranging an impact on the everyday lives of Ontarians as the Ministry of Transportation. We continue to, every day, ensure that Ontarians can count on us to get to work, school or their medical appointments. Without this transportation infrastructure, our economy would grind to a halt. This year we’ll invest a total of $10.7 billion in public transit, $4.3 billion in highways, and $321 million in other transportation property and planning activities. And with that, Chair, I will hand it over to you.

Official source

3:51 p.m.Official transcript

The Chair (Hon. Laurie Scott)

That’s right on the dot. Thank you very much, Minister, for your presentation. We will now begin the question-and-answer segment in rotations of 15 minutes for the official opposition members, 15 minutes for the third-party member, 15 minutes for the government members for the remainder of the allotted time. As always, please remember to make your comments through the Chair. As the Chair, if a member seeks to reclaim the floor during their rotation while the minister is responding, I will recognize the member and allow them to reclaim the floor to ask a new question. For the deputy minister, assistant deputy ministers and ministry staff: Please state your name and title the first time you speak, so that the proceedings can be accurately recorded in Hansard. I will start with the official opposition and it’s going to be MPP Begum.

Official source

3:52 p.m.Official transcript

Ms. Doly Begum

Thank you very much, Chair. Good afternoon, Minister and the entire staff. Thank you to the entire ministry staff for being here this afternoon. I was actually hoping that we would have some other folks who are also key stakeholders or members in terms of transportation and what’s going on in the province, so pardon me if I direct a lot of the questions at you, Minister. Over two years ago, the former Metrolinx CEO, Phil Verster, called a press conference to announce—and you’ll remember this, because you and I both spoke about this and I spoke in the House asking about Phil Verster’s press conference at that time—and he announced that the Eglinton Crosstown would not open that year. It was a press conference about nothing. But he had “a very good understanding” of when the line would open. More than two years later now, the line is still not open. It’s clear that there are very serious problems with the Eglinton Crosstown, requiring more than just a few tweaks and adjustments and that Mr. Verster actually knew what these were. That probably explains why he left. But Metrolinx has repeatedly refused to explain what went wrong. So my question is to the minister. How does Metrolinx justify withholding that information from the public?

Official source

3:54 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

Thank you very much for your question. Look, we have a very rigorous process, one that is taken from past experiences such as the Ottawa LRT, that we incorporate into ensuring that our transit operations that we then take online are safe and reliable. I think what you’re quoting at that time noted deficiencies that he had stated, and those are being worked on as we work through the project. Right now, we are in the RSD phase of that project. Finch West LRT completed its RSD phase. We have a very rigorous process on testing and commissioning before we open it up to the public. But ultimately, we will not open it until it’s safe and reliable. We’ll continue to work towards that over the next couple of weeks, and we’re confident that we will get there.

Official source

3:55 p.m.Official transcript

Ms. Doly Begum

Thank you very much. I appreciate the answer, Minister. The problem is, we have been left in the dark for so many years now with Metrolinx. There’s sort of a sense of arrogance, I think, even to you and the entire ministry, from Metrolinx. We’ve heard rumours that there are tracks that were actually built wrong or the tunnel needed to be re-graded. So clearly there were major design or construction deficiencies, requiring years of remediation work. Will you or your ministry tell the public what these deficiencies were?

Official source

3:55 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

Civil work on the project was completely completed, and I announced that probably over two years ago or a year ago. So I don’t think it’s appropriate for us to speculate on any of that. But from our perspective, we continue to ensure that when this system is delivered, it is done so in a safe way and a way that is reliable for passengers to then be on in service when the TTC takes over.

Official source

3:56 p.m.Official transcript

Ms. Doly Begum

In that case, can I just ask: Do you know what the deficiencies were?

Official source

3:56 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

—with our members at Metrolinx, Michael Lindsay and his team, to ensure that we continue to develop a system, like we did on the Finch West LRT, that will pass the test and that will pass the reliability that will then give us the confidence to move it forward. That’s what we continue to do on Eglinton. We will rigorously test that system until it is appropriate—

Official source

3:57 p.m.Official transcript

Ms. Doly Begum

I just want to reclaim my time. I live very close to the line, so I watch the testing being done, and I know there needs to be consecutive days of this testing done. Unfortunately, there were a couple of pauses in between as well. I’m guessing from the answer that the minister or the ministry does not actually know what these deficiencies were. Or is Metrolinx withholding that information from the ministry?

Official source

3:57 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

What I can tell you is that we work very closely with Metrolinx to ensure that the system will be safe and reliable once it is open, and so we work through that and any challenges that come before it. We have a team of engineers, designers, all of our counterparts that are involved in that contract that are taking to task every single one of those challenges—or any challenge that arises—as we try to get it to that phase, just like we did on the Finch West LRT. That’s what we’ll continue to do on Eglinton. We’re confident in our testing abilities and the rigorous standard that we apply to it—probably more rigorous than any other—learned from previous projects like the Ottawa LRT.

Official source

3:58 p.m.Official transcript

Ms. Doly Begum

Thank you very much. I appreciate that. I still didn’t get an answer, so I’m going to, for the record, assume that it looks like Metrolinx is not actually being transparent with the ministry and the minister. My next question would be: Why is it that Metrolinx is entitled to keep secrets from the public that pays for the project?

Official source

3:59 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

Look, we’re delivering over $70 billion in our public transit plan—

Official source

3:59 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

We continue to make improvements to our public transit system across the province, whether that’s GO expansion, whether that’s the Finch West LRT, and we’ll continue to do that. We’re going to continue to build public transit, we’re going to continue to make those investments, and we’re going to continue to ensure that any line that is then operational passes the test of reliability and safety. It’s my job, working with Metrolinx, to do that.

Official source

4:00 p.m.Official transcript

Ms. Doly Begum

Minister, I think I know the answer, but do you think Ontarians work hard in this province? Just yes or no.

Official source

4:00 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

Every single Ontarian works hard. You work hard, everyone here—all of our officials, the people working on the line work very, very hard. Interjection.

Official source

4:00 p.m.Official transcript

Ms. Doly Begum

Yes. So do you think when they pay their tax dollars for something that they want in return, how—

Official source

4:00 p.m.Official transcript

The Chair (Hon. Laurie Scott)

Sorry to interrupt. MPP Saunderson, point of order?

Official source

4:00 p.m.Official transcript

Mr. Brian Saunderson

Madam Chair, we’re out of scope here. I think the questions should be limited to the estimates for this year, for the MTO and the budget. We’re getting off on a tangent here that I don’t think has any relation to this year’s scope.

Official source

4:00 p.m.Official transcript

The Chair (Hon. Laurie Scott)

I’ll let MPP Begum finish her question within what MPP Saunderson—

Official source

4:00 p.m.Official transcript

Ms. Doly Begum

Sure. I’ll keep it to the estimates specifically. Metrolinx has faced repeated cost overruns and delays on major projects such as the Eglinton Crosstown LRT, with operating subsidies projected to decrease by over $182 million—which is in the estimates, for my friends on the other side—and capital allocations to be reduced by an estimated $448 million within 2025-26. What mechanisms are there in place to ensure that these funding adjustments do not further delay ongoing transit projects and compromise service improvements for commuters? It’s directly related to the estimates.

Official source

4:01 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

If you look at the global trends, there are a significant amount of reports in the public that are recognized worldwide, that over—if you want to take the last five years, last 10 years, the cost of building transit has significantly increased. I think that’s a reality that we live in, if you look at the last five years, if you look since the pandemic. The global supply chain challenges—

Official source

4:02 p.m.Official transcript

Ms. Doly Begum

I’m sorry, Minister. You’re not answering my question, so I’m just going to reclaim my time.

Official source

4:02 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

I am answering your question because you’re asking about cost overruns. I have to address the issue of cost overruns to explain why costs are higher.

Official source

4:02 p.m.Official transcript

Ms. Doly Begum

So that I do have. Just to reclaim my time, when the Eglinton Crosstown, the P3 project, was signed in 2015, the estimated costs for the contract’s capital component was $5.5 billion. Trust me when I say this: We all know that the cost has gone up. What does the ministry now estimate will be the final capital cost to the public of the Eglinton Crosstown?

Official source

4:02 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

There are a couple of things there. When the project was first announced, it only included construction costs. There are also property acquisition costs. There are maintenance and life cycle costs that also need to be considered that were not reported—sometimes or in this circumstance, in some projects or in some contracts—when they were issued. Whether it be the Ontario Line or it some of the other projects, we continue to update that as the projects are completed, as the final values are established. We will continue to follow that process on all of our projects moving forward, as we have for the last many years.

Official source

4:03 p.m.Official transcript

Ms. Doly Begum

So it looks like we don’t have an actual final capital cost. Then my questions are—I guess my only question would be: Will the Eglinton Crosstown open in 2025?

Official source

4:03 p.m.Official transcript

Ms. Doly Begum

Just a yes or no. I only have maybe just a minute left, so just yes or no.

Official source

4:03 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

As I’ve said to you in the past and I will continue to repeat, my goal and my direction to Metrolinx is that we will open it when there is a safe and reliable system for individuals—

Official source

4:04 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

When we continue to get through the testing, as we have done on the Finch West LRT. We need to see those tests pass. I have confidence in Metrolinx and their team to do that. So I continue to tell the team—whether it be at Metrolinx or working with the TTC—that we need to ensure that the system is safe and reliable before it can open for passengers.

Official source

4:04 p.m.Official transcript

Ms. Doly Begum

Absolutely. When do you expect the system to be safe and reliable to open? Will that be in 2025, do you think?

Official source

4:04 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

We continue to do the testing on it and when it is safe and reliable, we will ensure—

Official source

4:04 p.m.Official transcript

Ms. Doly Begum

Okay. In that case, I’ll ask: Is it the first three months of 2026?

Official source

4:04 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

We will continue to test the system and when that is completed, we will let everyone know.

Official source

4:05 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

As I said, when the system is safe and reliable and we are satisfied that they can hold passengers, then we will move forward to opening.

Official source

4:05 p.m.Official transcript

Ms. Doly Begum

Then, in that case, today, can I get a promise from the ministry and the minister that it will open in 2026—within the entire year?

Official source

4:05 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

As I’ve said to your last five questions, when I am confident that the system is in a safe and reliable manner, that is when we will proceed with opening the Eglinton LRT.

Official source

4:05 p.m.Official transcript

Ms. Jennifer K. French

I’m just going to shift gears entirely and go a bit local. The folks east of Toronto have been very patient, and I am glad to hear the minister talk about the Bowmanville GO extension. Do we have a date for when that will be completed, or a rough estimate?

Official source

4:05 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

We continue to make good progress on it. We work on that project, very specifically, with CPKC, who own the line on it, so our conversations with them continue. It is an ongoing negotiation. As a part of our plan to build the GO expansion over the next 10 years, this is a priority project for the government. So we continue to have dialogue with the members of CPKC on the additional tracks, on the upgrades that continue to need to happen to enable those service enhancements, and that’s what we’ve committed to. On the Lakeshore East line, for example, we have made improvements to those services just as recently as this past month. Those are a recognition of our partnership with them. Ultimately, as we make a commitment in the future to continue to build out the infrastructure investment needed to expand that, that is what we will do.

Official source

4:06 p.m.Official transcript

Ms. Jennifer K. French

Thank you. Further to the projected construction and all of that, as I had mentioned to you briefly, folks in Oshawa are a bit twitchy because we’re hearing about the construction shutting down our Simcoe Street in Oshawa, which is the main drag, so to speak. So I would like to know if Metrolinx—or if the minister is aware of or can connect with Metrolinx and get us an answer. Our city council has passed a motion; people are concerned. We want to know if Metrolinx plans to close down Simcoe Street in all directions for a full year while replacing the bridge on Simcoe Street South at the CPR tracks.

Official source

4:07 p.m.Official transcript

Ms. Jennifer K. French

That would be something that the city would need to plan for, and we haven’t been given that information. So, as you can appreciate, people are worried about the timelines and negative impacts of living with construction. So can I get a commitment or information?

Official source

4:07 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

MPP French, I’m happy to take that and get you the information you need with respect to our team at Metrolinx and any sort of closure. We do try to—and I hope this did happen—give advance notice of closures and work with the community to mitigate any of those closures and traffic impacts. So we will definitely, as a regular course of business with Metrolinx, but personally to yourself, have our team reach out.

Official source

4:08 p.m.Official transcript

Ms. Jennifer K. French

I’ll add to that, then: If we can touch base on this or connect at a later date, I also have constituency concerns that we can’t get answers back from Metrolinx, and I’d appreciate help from the ministry navigating those community concerns with Metrolinx.

Official source

4:08 p.m.Official transcript

The Chair (Hon. Laurie Scott)

Thank you very much. Over to the third party. MPP Watt.

Official source

4:08 p.m.Official transcript

MPP Tyler Watt

Thank you, Minister, and everyone who’s here today. This is an interesting, fun process for us all. Minister, I want to start off with discussing the Barnsdale interchange on Highway 416 in Ottawa. I was really happy to see that this is, in fact, in the estimates. The government had announced, back in 2014, that they were going to be investing $5 million into this Barnsdale interchange. So in the estimates, I just want to know, despite repeated announcements from my predecessor and this government, the photo op—we actually saw the Barnsdale interchange sign go up, and then it came down quickly after that, and there’s reference in the 2024 and 2025 budgets—when can families in Nepean expect the beginning stages of Barnsdale Road and Highway 416?

Official source

4:09 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

Thank you for the question, MPP Watt. We’ve been making good progress on it. As far as our initial investment for the detailed design phase of it and the environmental assessment phase, to get into a bit more detail on it, I’ll ask Alain to come and share some details specifically on a project with respect to the interchange.

Official source

4:10 p.m.Official transcript

Mr. Alain Beaulieu

Thank you, Minister. Hello, everybody. I’m Alain Beaulieu. I’m the chief engineer at the Ministry of Transportation. So the Barnsdale Road underpass currently carries traffic east-west along Barnsdale Road over Highway 416. The city of Ottawa had identified a need for an interchange with Highway 416 at Barnsdale Road to address residential growth and development in south Ottawa. The proposed interchange will provide entry and exit to and from northbound—

Official source

4:10 p.m.Official transcript

MPP Tyler Watt

Sorry, I just wanted to—I appreciate the history on the Barnsdale interchange, but I want to know the timeline and how much money is going to be spent on it.

Official source

4:10 p.m.Official transcript

Mr. Alain Beaulieu

Absolutely. The ministry is currently initiating the detailed design phase of this work, and that’s in procurement now, which will take place over the next three years, with an anticipated completion of 2027 for the detailed design then proceeding to construction. Property acquisition is required for the new interchange and that will take up to 24 months, and then the scheduling of construction will follow the completion of this detailed design, property acquisition, any utility relocation work and obtaining all the necessary approvals.

Official source

4:11 p.m.Official transcript

MPP Tyler Watt

Thank you very much. Is the ministry consulting with the city of Ottawa and local community associations like Barrhaven South and Half Moon Bay, to ensure that this interchange design meets local traffic, cycling and pedestrian safety needs?

Official source

4:11 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

Well, like we do with all of our investments, especially when we do partner with municipalities, we definitely as a part of our engagement have those conversations with the city officials, city designers, technical staff, and take into account and consideration local needs. So we will definitely be doing that, and probably have already begun that process, as we’re working very closely with the city of Ottawa on this joint announcement for our spending.

Official source

4:12 p.m.Official transcript

MPP Tyler Watt

Thank you very much. So given that the population growth around this area—it’s booming right now, so this interchange is actually so critical to this community. I appreciate that it can take time to get the design and everything in place, and I’m looking forward to getting shovels in the ground there. But with this potentially taking until 2027, how can we future-proof, with all the housing construction that’s going on there, to ensure that there are not going to be even more delays that come with this design and then actually getting shovels in the ground?

Official source

4:12 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

I think the positive factor is that the procurement is out in market as we speak for the design phase of it. There are ways for us to continue as the progress is being made on the detail design work to look at ways to accelerate projects that we have in the past, whether that be speeding up the property acquisition phase of it or enabling early works. But ultimately, the reason for making this investment in that community, in your community, is recognizing the fact of the growth that is happening and the challenges that the city had at that time, and funding infrastructure to meet the needs. That’s where the government stepped in to help support projects like this. We’re very much committed to ensuring that this gets done in a timely fashion. The positive note, as I said, is that we’ve already launched the procurement side of it, and so post that, we will continue to work as quickly as we can to ensure that the timelines are met and that the infrastructure is—

Official source

4:14 p.m.Official transcript

MPP Tyler Watt

Thank you, Minister. I’m going to move on to the Ottawa new deal. I’m glad to see there’s a section of Ottawa in here. I only see some stuff about Ottawa Road 174. During the provincial election, your party did promise to upload the Ottawa LRT, and I don’t see anything in here about that, but there are some funding numbers in here and I’m wondering: Is the Ottawa LRT upload a part of Ottawa’s new deal still?

Official source

4:14 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

The Ottawa new deal occurred pre-official signing of the Ontario-Ottawa deal, so the Ottawa-Ontario deal initially was struck on a $500-million commitment, and $181 million of that was committed to transportation infrastructure. So you mentioned the Barnsdale Road interchange, Highway 174 and some money for—

Official source

4:14 p.m.Official transcript

MPP Tyler Watt

Sorry; just to bring it back, though: Is the LRT a part of this?

Official source

4:15 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

The LRT is a commitment that we made during the election, which was on top of the investment that we made that was prior to the election—or two years prior, I believe, to the election—on investing $500 million into the city of Ottawa. And so, we continue to work through having due diligence and conversations with respect to the mayor and his team and city officials as to how that would proceed in the coming years and months. The Ottawa LRT is a commitment on upload that we made and something that we will continue to work through over the coming months. But that is on top of the new deal that we structured, which included the Kanata North Transitway, an investment that the government put forward; the Barnsdale interchange—

Official source

4:15 p.m.Official transcript

MPP Tyler Watt

I appreciate all of that, but are you saying that this was more just an election promise, instead of actually implementing it?

Official source

4:16 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

Well, look, this is a commitment that we’ve made, and as we’ve done in the past with the city of Ottawa, we’ve followed through in our commitments, and we continue to work with the city. We have a great relationship with your mayor—

Official source

4:16 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

The Ottawa new deal happened prior on the timeline of the Ottawa LRT, and then months later when this came up, we worked with your mayor as the city’s needs evolved to have conversations around the LRT. Those are conversations that continue to be had to this day, whether it’s on the official levels or on the political level, and something that we continue to work with your team on. I’ll give you an example: We worked with the city of Toronto on the upload of the DVP. On the Gardiner, it continues to happen. We’re in the due-diligence phase of it, and so we’ll continue to work through the process on our commitments.

Official source

4:17 p.m.Official transcript

MPP Tyler Watt

Good, I’m glad that you’ve made a commitment, but when will this government fulfill that?

Official source

4:17 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

Well, we move through the process. We’ll continue to have and engage in those conversations, as we have already started, and that is a process of time that will continue to evolve. These are large infrastructure commitments that we’ve already started to flow the funding on. For example, Highway 174: The $9-million operating funding that started to flow, continues to flow today. On the Ottawa new deal, our commitments to policing in the Ottawa new deal have already gone forward.

Official source

4:17 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

As we continue to have those conversations on the Ottawa LRT, we’ll work with the city, do our due diligence with the city, understand the scope of what the ask is and continue to move forward on it.

Official source

4:18 p.m.Official transcript

MPP Tyler Watt

Okay. I appreciate it. Something in your opening remarks: You said that ridership is stronger than ever. On page 18, your ministry says that transit ridership has only returned to 80% of pre-pandemic levels. I’m glad that it is slowly healing and coming back up, but with ridership stronger than ever, why is your ministry proposing to cut funding to transit operations?

Official source

4:18 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

We’re not cutting money to transit operations, and I’ll reference the number that—

Official source

4:18 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

I’m happy to have our team explain any of that. But when we look at specifically—GO expansion is what I referenced in my remarks. For example, in September, we had a record year with the highest ridership that we’ve ever seen on the GO network. And so, we continue to build upon that as we continue with, I think, 94% on our GO ridership. Now, there are some cities—for example, your city of Ottawa—that have not seen the recovery of ridership in transit and that’s for specific reasons. You have other cities like the city of Brampton that have far exceeded their pre-pandemic levels, and Mississauga and York region. Everyone varies. But when we look specifically at the GO Transit operations, we have seen strong recovery on those processes. But at no point have we decreased funding in any way to transit operations—

Official source

4:19 p.m.Official transcript

MPP Tyler Watt

I’m going to go back to my initial question, though. So, you said you’re not cutting, but there is a $450-million cut to transit operations. So how are you going to expand subway and GO train service when you’re cutting operations budget by that much money?

Official source

4:20 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

That’s not accurate, and I’ll have James from our team explain specifically on the numbers, but there’s no one that has invested—

Official source

4:20 p.m.Official transcript

Hon. Prabmeet Singh Sarkaria

There has been no government that has invested more in transit operations and transit capital than this government. But James, who is the ADM on the transit side, can actually specifically mention that.

Official source