Introduction 432, sponsored by Council Member Lynn C. Schulman, would amend New York City’s Administrative Code. Its goal is to have the Department of Transportation (DOT) repair hazardous curbs when it resurfaces a street. The bill is in committee and is not law; it is waiting for committee action.

  • When DOT resurfaces a street, it must also repair any curb that DOT determines to be a safety hazard.
  • The duty applies only to streets resurfaced by DOT and curbs DOT determines are safety hazards. It does not require repair of every broken curb.
  • The law would take effect 120 days after it becomes law.

What it means for you#

  • Residents: A hazardous curb may be repaired as part of resurfacing on a street DOT resurfaces. The bill does not set up a process for residents to request or appeal a curb decision.
  • DOT: The department would have to make the specified curb repairs. It would decide which curbs pose a safety hazard.
  • People seeking curb repairs: The bill does not require DOT to repair hazardous curbs outside a street-resurfacing project.

Money#

No publicly available information about the estimated cost.

  • The bill requires DOT to make curb repairs during qualifying resurfacing projects, but gives no cost, staffing, or funding estimate.

What is unclear#

  • The bill does not define “safety hazard” or set criteria for DOT’s decision.
  • It does not say how residents can report a curb or ask DOT to assess it.
  • It does not specify what repair work is required or how DOT would pay for it.

Case for#

  • The Council’s summary says the bill would require DOT to fix curbs that pose a safety hazard as part of street resurfacing. Doing the work during resurfacing could address hazardous curbs alongside the street work.

Case against#

  • One concern is that the bill leaves DOT to decide which curbs are safety hazards without setting criteria or a review process.
  • The bill requires repairs but provides no cost estimate or funding details.