Ontario bill makes homes EV-ready

Summary#

Bill 199, the EV-Ready Homes Act (Electric Vehicle Charging), 2024, would amend Ontario’s Building Code Act, 1992. Its stated goal is to make certain new houses ready for the future installation of electric-vehicle charging equipment; the bill does not require a charger to be installed. It would take effect on a day set by proclamation.

  • Builders of covered houses would have to install a panel board of at least 200 amps, a conduit for future cables, and an electrical outlet box.
  • The conduit and box would have to block gas and exhaust fumes from passing through.
  • The house must be subject to Part 9 of the building code, have a garage, carport or driveway, be connected to an electricity distribution system, and not be a seasonal recreational building.
  • The duty would apply to houses built after the section comes into force. The bill does not require charging equipment itself to be installed.

What it means for you#

  • Builders: You would have to ensure the listed electrical components are installed in each house that meets the bill’s conditions.
  • People buying or owning a covered new house: The house would have the specified infrastructure for a future charger, but the bill does not require a charger or promise that installing one later will be possible without further work.
  • Owners of existing houses and seasonal recreational buildings: The bill does not impose this new requirement on those homes.
  • General public: The bill does not directly change taxes, fees, or access to charging stations.

Money#

No cost estimate is included in the supplied material; no publicly available information on the bill’s total cost.

  • Builders would have to provide the required components, but the bill does not state who would ultimately pay or estimate the cost.
  • The bill does not specify public spending, staffing, or a new fee.

What is unclear#

  • The bill does not set a start date; that would be set later by proclamation.
  • It does not set out inspection or enforcement details for the new requirement. The Building Code Act was not supplied, so I could not verify how existing enforcement rules would apply.
  • The supplied material does not explain how the new requirement would interact with current building-code requirements.
  • The bill does not say how much compliance would cost or who would bear that cost.
  • The bill does not say whether the listed components will be enough for a future installation in any particular house.

Case for#

  • The bill appears intended to make future installation of electric-vehicle charging equipment easier in certain new houses.
  • Requiring the infrastructure during construction could be seen as a way to avoid some work later. That is a possible practical benefit, not a result guaranteed by the bill.
  • The bill limits the requirement to specified houses and requires the conduit and outlet box to block gas and exhaust fumes.

Case against#

  • Builders would have to install the components even when a future owner may not want a charger.
  • The bill requires a 200-amp panel board and other electrical work but provides no cost estimate.
  • The bill does not require a charger to be installed, so the infrastructure alone does not ensure that a house will have charging equipment.
  • The bill does not set out how compliance will be checked or explain how the new requirement fits with current building-code rules.