Vancouver rezoning would yield 35-storey tower

Summary#

On July 14, 2026, Vancouver City Council approved in principle a rezoning application for 807–819 Hornby Street and 908–948 Robson Street. The decision would change the site from Downtown (DD) zoning to a site-specific Comprehensive Development (CD-1) district, if Council later enacts the zoning by-law. The stated goal is to allow a mixed-use development with housing, hotel rooms and commercial space.

  • The approved-in-principle plan is a 35-storey building with 176 strata homes, 160 hotel rooms and ground-floor retail. It includes an 11-storey commercial podium and a public plaza.
  • The maximum floor space ratio (building floor area relative to site area) would rise from 6.0 to 14.5, and the maximum height from 21.3 metres to 108.7 metres.
  • Council also approved changes to the Sign By-law and Noise Control By-law for the site, conditional on the CD-1 by-law being approved.
  • Council’s approval is not final rezoning or permission to build. It creates no legal rights for the owner, and the City is not required to enact the by-law. The proposal remains subject to approval conditions and later development review.

What it means for you#

  • People who live, work or visit nearby: If the project proceeds, the site could gain homes, hotel rooms, retail space and a public plaza. City staff estimate the building would add 3.4% more shadow than the expected baseline on the north sidewalk of Robson Village; staff say a 13-storey reduction would be needed to eliminate that added shadow.
  • The property owner and applicant: They would need to meet the rezoning conditions and secure later approvals. The decision does not guarantee the zoning change or the building.
  • Residents seeking below-market housing: The approved plan lists 176 strata homes. The supplied material does not identify social or below-market homes.
  • People concerned about traffic and parking: Eight underground parking levels are proposed, but parking and loading details are to be finalized at the development-permit stage under the Parking By-law.

Money#

The project is expected to make payments or contributions to the City, but the available material gives no estimate of City costs.

  • The expected Development Cost Levy is $8,025,092, based on December 2025 rates.
  • The Community Amenity Contribution is $4.3 million, but may be reduced to $2 million if the owner meets the stated conditions and the zoning by-law is enacted within 24 months of approval in principle. If enactment takes longer, the amount increases by $255,000 every three months, up to $4.3 million at 48 months.
  • The expected public-art contribution is $536,809, or the applicant may provide 60% as cash in lieu.
  • The report does not estimate City staffing, review or other costs.

What is unclear#

  • The supplied material does not list the full rezoning conditions, so their details are not clear here.
  • The final building design, parking and loading arrangements, and tree numbers remain subject to later review.
  • The material does not explain the timing or process for Council’s later decision on enacting the CD-1 by-law.
  • The CAC terms refer to further escalation after the reduced $2 million amount, but the supplied material does not explain that calculation.

Case for#

  • City staff say the site is suitable for a hotel and housing under the City’s downtown and hotel policies. The plan would add 160 hotel rooms and 176 homes in a central location.
  • Staff say the hotel space and overall project benefits outweigh the added shadow they expect on Robson Village’s north sidewalk.
  • The expected levies and contributions would provide money for public benefits, public art and City services.
  • Of 39 public submissions, 16 supported the project and four were mixed. Supportive comments cited hotel space, housing, the location, design and public space.

Case against#

  • The project would allow a much taller and denser building: up to 35 storeys and an FSR of 14.5, compared with the current limits of 21.3 metres and an FSR of 6.0.
  • City staff estimate additional shadow on the north sidewalk of Robson Village. Residents also raised concerns about shadow on Robson Square, views and nearby heritage landmarks.
  • Eighteen of the 39 public submissions opposed the project. Concerns included traffic, scarce parking, hotel overconcentration, neighbourhood character and whether infrastructure could support more residents.
  • The plan includes strata homes but does not identify below-market housing; some comments argued for more housing relative to hotel use.