City approves seniors housing height rise

Summary#

Vancouver City Council adopted a revision to the approval in principle for the CD-1 rezoning at 8080 Yukon Street. It raises the permitted height in Sub-area A from 23 metres to 25.3 metres for a six-storey seniors housing building; the goal, according to City staff, is to allow a construction method the applicant says can lower costs and shorten construction time.

  • The revised draft CD-1 by-law replaces the earlier draft, but it is not yet enacted. City staff may bring it forward for enactment only after the original rezoning conditions are met.
  • The overall proposal remains four residential buildings with 903 social housing units: 123 seniors’ units in the six-storey building, and 780 units in three taller buildings.
  • The revision does not add floor area or change the proposed uses. The overall maximum height remains 97 metres.
  • Council adopted the decision on consent. The decision itself creates no legal rights or obligation for the City to enact the rezoning.

What it means for you#

  • People who may live in the proposed housing: The revised height limit applies to the six-storey seniors housing building. The decision does not add units or change the proposal’s social-housing use.
  • Nearby residents: The permitted height for that building increases by 2.3 metres. The report says a public hearing could not be held for a development consistent with the relevant official development plans and with majority residential use.
  • The applicant and property owner: They must still meet the original conditions of approval before the revised by-law can be brought forward for enactment.
  • The City: This decision changes the draft by-law to be brought forward, but does not require the City to enact it.

Money#

The revision adds no new public benefits or City contributions, but the materials give no cost estimate for the construction change or the City’s work.

  • No additional Community Amenity Contributions, public art contributions, or Development Cost Levies are recommended.
  • City staff say the applicant chose new building technology to reduce construction costs and shorten the construction timeline. No savings amount is provided.

What is unclear#

  • The materials do not describe the new construction technology or quantify its expected cost or time savings.
  • The date for enactment, and whether the original conditions will be met, are not stated.
  • The materials do not describe how the added height may affect the building’s design or people nearby.

Case for#

  • City staff say the added height is needed for the applicant’s chosen construction technology, which the applicant expects to reduce costs and shorten construction time.
  • Staff say revising the by-law before enactment could avoid construction delays and possible effects on funding commitments.
  • Staff say the modest height increase is consistent with policies that allow case-by-case height increases for developments where all residential floor space is social housing.

Case against#

  • A possible trade-off is that the seniors housing building may be 2.3 metres taller, even though the revision adds no floor area or housing units.
  • No public hearing was held on this revision; the report says the Vancouver Charter prohibited one for this development. The materials do not describe other ways nearby residents could comment on the height change.