Municipal
Montréal Motions
2025–2029 Term
Loan for restoring municipal heritage buildings
The motion would authorize a loan of $22.8 million for the restoration of municipal heritage buildings related to cultural development. It must be approved by the Minister of Municipal Affairs.
Orientation au conseil d'agglomération
City grants $110,000 to the Chamber for forums
The council approves a resolution allocating $110,000 to the Metropolitan Montreal Chamber of Commerce for four strategic forums and sets the terms of disbursement.
Orientation au conseil d'agglomération
Automated sorting for library approved
The council motion approves a contract with Bibliotheca Canada Inc. for an automated sorting and return system at the library and the Espace du Cœur-Nomade, total cost $216,897.81.
Résolution
Montreal guarantees $2M for racetrack study
Montreal adopts a resolution granting a $2M guarantee to the Canada Infrastructure Bank to finance studies at the racetrack site.
Résolution
Municipal contract for rock and concrete recovery
The municipal resolution approves a 14-month framework agreement with a 12-month option for rock, concrete, and asphalt recovery, up to $608,769.63.
Résolution
Maintenance contract for uninterruptible power systems
Motion of the municipal council to grant Dataglobe Canada Inc. a 35-month contract for the maintenance of uninterruptible power systems, totaling $457,529.22.
Orientation au conseil d'agglomération
City extends the maintenance contract for systems
The municipal council approves the 12-month extension of the contracts with Baulne inc. for HVAC and authorizes $1,381,551.95 plus $276,310.38 in contingencies.
Orientation au conseil d'agglomération
Air compressor maintenance contracts awarded
Resolution awarding two contracts to Baulne Inc. for the maintenance and repair of industrial air compressors over 35 months, with two 12-month extensions, total cost $442,566.11.
Orientation au conseil d'agglomération
Infrastructure contract for rehabilitation of pipes and streets
Council motion: grants Vortex Infrastructure Services Inc. a contract of $12,093,300 to rehabilitate water pipes and streets in Côte-des-Neiges-Notre-Dame-de-Grâce.
Résolution
Approved road contract for seven boroughs
A resolution authorizes Demix Construction to carry out roadwork in seven boroughs for a total of $8,474,495.41.
Résolution
Infrastructure Contract: Water Main Rehabilitation
The municipal council adopts a resolution approving a contract of $11,879,611.25 taxes included for water main rehabilitation and road work in Plateau-Mont-Royal and Rosemont–La Petite-Patrie.
Résolution
Soil management contract for ramp
The council awards the contract to Loiselle Inc. for the access ramp of the quarry. Total cost: $2,816,171.24 for phase 2, Villeray–Saint-Michel–Parc-Extension.
Résolution
City approves rehabilitation of water pipes and roadwork
The municipal council awards a contract of $18,387,484.22 to Vortex Infrastructure Services Inc. for the rehabilitation of water pipes and roadwork, with performance evaluation.
Résolution
Approved municipal infrastructure contract
The resolution authorizes the contract with Pavages D'Amour inc. for sewer, water, and roadway work in Saint-Laurent for $2,055,048.90.
Résolution
Sidewalks: approved minor repairs
The municipal council adopts a resolution on sidewalk work on the arterial network of the City, as part of the 2026 Road Infrastructure Maintenance Program.
Résolution
Charging stations: Hydro-Québec contract approved
Resolution authorizing Hydro-Québec to install 200 on-street charging stations in 2027-2028, maximum cost $3,782,141.33 taxes included; the director signs the letters of acceptance.
Résolution
Renovation of municipal streets and cycling paths
The municipal council approves service offers to design and execute planing-paving and renovate the cycling paths identified by the 2019 Bike Plan in Ville-Marie and Villeray–Saint-Michel–Parc-Extension.
Résolution
The city approves the offer for the rehabilitation of Souligny Avenue
The municipal council approves the offer to rehabilitate the roadway and sidewalks on Souligny Avenue between Honoré-Beaugrand and Saint-Émile. The resolution was adopted unanimously.
Résolution
Extension of municipal engineering agreements
Municipal motion authorizes the first 12-month extension of the framework agreements for professional engineering services with WSP Canada Inc. and Les Services EXP Inc.
Orientation au conseil d'agglomération
Approved municipal library renovation
The municipal council awards the contract to Groupe St-Lambert to renovate the Père-Ambroise library at 2093 Visitation Street to integrate self-service; expenditure of $1,124,526.20.
Résolution
Municipal expenditure for mobile solutions
The municipal council votes for an additional expenditure of $120,378.83 for native mobile solutions development services, bringing the total of the agreement to $922,904.33.
Orientation au conseil d'agglomération
City Council approves ERP Cloud expenditure
The council resolution authorizes an additional expenditure of $1,709,506.94 for professional services related to Oracle ERP Cloud, bringing the total to $13,106,219.86.
Orientation au conseil d'agglomération
City approves software and license expenditure
Council resolution approves an expenditure of $199,477 for membership in the standing offer contract, bringing the total to $2,652,757.48 and activating the quantity variation budget.
Orientation au conseil d'agglomération
Additional expenditure for Agri-Food Meetings
The municipal council adopts a resolution authorizing an additional expenditure of $50,000 for the Montreal Agri-Food Meetings, bringing the total of the agreement to $100,000.
Orientation au conseil d'agglomération