Data centre rezoning stalled for public input

Summary#

Vancouver City Council’s final action on July 14, 2026, was to send the rezoning report back to City staff for further public consultation. Council had earlier voted to refer the rezoning to a public hearing, then reconsidered that vote; the final motion for more consultation carried unanimously, with Mayor Sim absent for the vote.

The rezoning itself was not approved. It would change the site at 111 East 5th Avenue and 2060 Quebec Street from I-1A industrial zoning to a site-specific Comprehensive Development district (CD-1).

  • The application proposes using the existing three-storey commercial building for bulk data storage, with a café at ground level. It proposes 3.0 floor space ratio (FSR, a measure of building floor area relative to lot size); City staff estimate up to 4.2 FSR may be needed.
  • If approved later, the rezoning would also be subject to proposed changes to the Sign By-law and Noise Control By-law, and a condition requiring the data centre to feed waste heat into the City’s False Creek Neighbourhood Energy Utility.
  • The report says the building’s height would remain 20 metres. The proposal includes data storage on three above-ground levels and two below-grade levels.
  • Council’s final motion calls for further public consultation. It does not set a hearing date or approve the rezoning.

What it means for you#

  • Nearby residents and the public: City staff must do further consultation, but the motion does not say what form it will take or when it will happen. The rezoning is not yet in force.
  • The applicant and property owners: The proposal does not give them a right to rezone or proceed with the data-centre use. The report says any costs incurred are at the applicant’s risk.
  • People concerned about housing or other uses on the site: The proposal is for data storage and a café, not housing. City staff say City policy does not support housing on this protected industrial land.
  • The public generally: The report says the proposed use would need to meet parking requirements at the development-permit stage. Council’s final motion does not itself change parking, noise, water, or electricity rules.

Money#

The available material gives no cost estimate for the further consultation or the Council decision.

  • The report expects no Development Cost Levy or cash Commercial Linkage Contribution if there is no net increase in floor area. If more density is needed, a text amendment and applicable contributions may be required.
  • City staff estimate that achieving the proposal may require more than 3.0 FSR, possibly up to 4.2. The report says detailed floorplans were not provided.

What is unclear#

  • What further consultation City staff will conduct, how people can take part, and when it will happen.
  • Whether and when Council will hold a public hearing on the rezoning.
  • How much floor area the project would ultimately need. If it needs more than the proposed 3.0 FSR, a further rezoning text amendment would be required.
  • The project’s expected electricity and water use, and its specific noise effects. The report describes public concerns but gives no project-specific estimates.

Case for#

  • City staff recommended a public hearing because of the extent of public input. Sending the report back for further consultation responds to the unusually high level of interest identified in Council’s motion.
  • The report records about 579 submissions. Staff say more consultation would give the public another opportunity to provide input before Council considers the application.
  • City staff say the data-storage use fits the site’s industrial land designation and the Broadway Plan’s focus on digital and information-technology uses.

Case against#

  • Residents who commented raised concerns about energy use, water use, noise, sustainability, and possible effects on electricity costs. The report does not provide project-specific estimates that would answer those concerns.
  • Some residents asked for a public hearing. The final motion requires further consultation but does not set a hearing date or say how staff will report back.
  • The online comment form recorded 275 opposed responses, three in support, and 11 mixed responses. Those views do not establish what the wider public thinks, but they show substantial concern about this particular proposal.

Votes

2 recorded votes on this bill, newest first.

  1. Division No. 11762

    Passed10 members voted

    Council: CD-1 Rezoning: 111 East 5th Avenue and 2060 Quebec Street (later this vote was reconsidered) (abstentions count as votes in favour under the Vancouver Charter)

    FOR · 8AGAINST · 2

    Each dot is one member. Hover or tap one to see who.

    8For

    • ABC Vancouver7
    • Vote Vancouver1

    2Against

    • Green1
    • COPE1

    1 member was paired and sat out the vote.

  2. Division No. 11761

    Defeated11 members voted

    Council: CD-1 Rezoning: 111 East 5th Avenue and 2060 Quebec Street - Refer Report to Next Day

    AGAINST · 7FOR · 4

    Each dot is one member. Hover or tap one to see who.

    7Against

    • ABC Vancouver7

    4For

    • Green1
    • COPE1
    • OneCity Vancouver1
    • Vote Vancouver1