Generator capacity cap expands to 300%

Summary#

HB 6385 would amend section 173 of Michigan’s Clean and renewable energy and energy waste reduction act. It would raise the limit on an individual customer’s distributed-generation capacity from 110% to 300% of the customer’s electricity use over the previous 12 months. Its apparent goal is to allow customers to install larger generators; the bill is introduced, not law, and would not take effect unless HB 6386 also becomes law.

  • The higher customer limit would still be subject to the utility or alternative supplier’s program limit: it is not required to allow a program larger than 10% of its average in-state peak load over the previous five calendar years.
  • The bill text retains rules for allocating that 10% limit: at least half is for generators of 20 kilowatts or less, and no more than half is for generators over 20 kilowatts and up to 550 kilowatts.
  • The text retains interconnection requirements, including utility testing and approval and a signed parallel operating agreement before a generator operates alongside the distribution system.
  • It does not change the text’s rules for customers’ electricity inflow rates or monthly credits for outflow. Those credits must reflect cost of service.

What it means for you#

  • Electric customers: If the bill became law, the program’s maximum generator capacity for a customer would rise to 300% of that customer’s prior-year electricity use. That is a ceiling, not a guarantee of approval or a credit for all power sent to the grid. The interconnection requirements and utility-level program limit would still apply.
  • Utilities and alternative electric suppliers: The text retains requirements for a uniform application process, records, and interconnection testing and approval. These are not all new duties created by this bill; the supplied text does not show which carried-forward rules would change.
  • Customers served by alternative suppliers: The text retains a requirement to send a copy of an application to the electric utility for the customer’s service area.

Money#

No publicly available information on public, utility, or customer cost estimates.

  • The supplied text does not set an appropriation, fee, or customer payment for the change.
  • Customers would continue to pay retail rates for electricity they take from the grid and receive monthly credits for electricity sent out, as determined by the commission. The bill does not change that wording.

What is unclear#

  • The supplied bill text presents the capacity limit as changing from 110% to 300%, but does not provide a separate copy of the current parent Act. I cannot independently verify every carried-forward rule against current law.
  • The bill does not say how utilities would handle applications if the 10% program limit is reached beyond the stated allocation and order-of-application rules.
  • No estimate is provided for any added utility work, equipment, or customer installation costs.
  • The bill’s effect depends on HB 6386 also becoming law; the supplied material does not explain what that bill would do.

Case for#

  • A possible argument for the bill is that customers could install generators with more capacity relative to their own electricity use.
  • The higher ceiling would operate alongside interconnection testing, safety requirements, and the utility-level program limit.
  • The text retains monthly outflow credits based on cost of service, rather than promising a particular credit amount.

Case against#

  • One concern is that a generator sized up to three times a customer’s prior-year use could produce more electricity than that customer uses, while the bill does not change how outflow credits are calculated.
  • The 10% utility-level limit remains, so the higher customer ceiling does not ensure that a customer can join the program or install a generator at that size.
  • The supplied material gives no cost estimate or analysis of how larger generators could affect grid reliability or utility costs.